Skip to main content
ALL PATHSPATH · 08

NETA Field Testing

Documentation practice for field crews: what each test verifies, what a defensible record contains, and how acceptance basis affects the recorded result. Educational workflows that reference NETA ATS-2025 and MTS-2023 — not a certification program.

LEVEL
Mixed
TOTAL TIME
2 h 30 min · 4 modules
AUDIENCE
Technician, Engineer, Contractor
VERSION
v2.0 · Published
YOUR PROGRESS0 / 4 · 0%

Progress is saved on this device. Sign in to sync it privately to your account and continue on another device.

Module timeline

  1. Switchgear inspection records

    Guided scenario 40 min

    Complete a visual and mechanical inspection record with defensible detail.

    Lab: Switchgear Inspection & Test RecordCompletes on: lab opened, guided scenario steps confirmed, knowledge check submitted, reflection confirmed
    Open module
  2. Circuit breaker testing

    Guided scenario 45 min

    Record breaker test results and evaluate them against a stated acceptance basis.

    Lab: LV Circuit Breaker Test ReportCompletes on: lab opened, guided scenario steps confirmed, knowledge check submitted, reflection confirmed
    Open module
  3. Transformer winding resistance

    Guided scenario 35 min

    Record winding resistance measurements and interpret inter-phase deviation.

    Lab: Transformer Winding Resistance Test ReportCompletes on: lab opened, guided scenario steps confirmed, knowledge check submitted, reflection confirmed
    Open module
  4. Motor polarization index

    Guided scenario 30 min

    Record a PI test and interpret the ratio in terms of insulation condition.

    Lab: Motor IR / DAR / Polarization Index Test RecordCompletes on: lab opened, guided scenario steps confirmed, knowledge check submitted, reflection confirmed
    Open module

What you will be able to do

  • State what each field test verifies and what it does not
  • Record a complete inspection with the data a reviewer needs
  • Explain how acceptance basis (ATS versus MTS) changes evaluation
  • Produce a documentation package that survives review

Prerequisites

  • Field experience with de-energised testing, or completion of Electrical Foundations

What counts as complete

All four modules marked complete. These modules build documentation practice; they do not qualify anyone to perform energised work.

Opening a lab never marks a module complete on its own.

Recommended next path

PLC & Controls

Sensor behaviour and ladder logic in industrial control.