NETA Field Testing

Module 2 / 4
Guided scenario45 min· Path total 2 h 30 min

Circuit breaker testing

ORIENT

What this module is for

Record breaker test results and evaluate them against a stated acceptance basis.

EXPERIMENT

Guided scenario in LV Circuit Breaker Test Report

Document a breaker test and change the acceptance basis.

CHECK

Quick retrieval check

Acceptance (ATS) and maintenance (MTS) testing differ mainly in:
APPLY

Put it in your own words

Explain why trending values over time can matter more than a single pass result.

Finish this module

Still outstanding before this module can be marked complete:

  • Lab opened
  • Guided scenario steps confirmed
  • Knowledge check submitted
  • Reflection confirmed

Saved on this device. Sign in to sync privately to your account and resume on another device.