Insulation-resistance & connection-resistance field test worksheet
All items must be verified by a qualified person before insulation-resistance or connection-resistance testing. High-voltage DC is applied during IR testing — the bus must be de-energized, isolated, grounded after testing, and cleared of connected loads/electronics as required.
Map labels are matched (case-insensitive) to test-section names and to each connection's From/To/Bus-Section fields to color sections and the connectors between them.
Connections are compared per NETA-style rule (any value > 50% above the lowest comparable value is flagged Investigate) and against any OEM absolute or custom project limits entered.