Busway / Bus Duct Insulation & Connection Test

NETA ATS · MTS Field Record
Field Testing · NETA-aligned

Busway / Bus Duct Insulation & Connection Test Report Field Report

Insulation-resistance & connection-resistance field test worksheet

Report workflow

This report may contain confidential facility and equipment information. Reports are private by default. Do not enter information you are not authorized to store. Report contents are kept in this browser unless you choose to sync privately to your Phase Academy account, and are never sent to analytics, URLs, logs, or error reports.
Project Information
Report Basis
Acceptance testing applies to new equipment prior to energization; maintenance testing applies to in-service equipment. The insulation acceptance basis, test parameters, and reference documents are recorded on the Nameplate & Setup tab.
Disclaimer: Final acceptance is subject to manufacturer instructions, project specifications, applicable NETA/NEC requirements, and AHJ/qualified-person review. Computed pass/fail/investigate results in this worksheet are aids only and do not by themselves constitute acceptance. This tool does not reproduce proprietary NETA tables; acceptance minimums must be supplied by the user, OEM, or project specification.
Nameplate Data
Test Setup & Acceptance Basis
Applicable Documents & Notes
Instrument Calibration & Setup
Insulation-Resistance Tester (Megohmmeter)
Micro-Ohmmeter (Connection Resistance)
Safety / Pre-Test Checklist

All items must be verified by a qualified person before insulation-resistance or connection-resistance testing. High-voltage DC is applied during IR testing — the bus must be de-energized, isolated, grounded after testing, and cleared of connected loads/electronics as required.

Bus Section Visual Map

Map labels are matched (case-insensitive) to test-section names and to each connection's From/To/Bus-Section fields to color sections and the connectors between them.

Tested / Pass
Deficient (Fail)
Investigate
Outstanding
Not Tested
Outstanding Section Tracker
Results needing a comment

Every failed, investigate, unevaluated, or manually overridden result must carry a comment before the record can be called complete. Comments are entered on the measurement itself so they stay with the reading.

Deficiencies, corrective actions & comments
Pre-export review

Record completeness, measurement results, manual overrides, and qualified-person disposition are tracked separately. A complete record is not a statement of technical acceptance.

Status before export
Saving & export

“Save on this device” writes to this browser only. “Sync privately to account” is available when the report is opened from My reports while signed in; it reports success only after your account confirms the save.

Overall Test Status
Test Statistics
Validation & Advisories
Result Breakdown
Connection Comparison & Investigate List

Connections are compared per NETA-aligned rule (any value > 50% above the lowest comparable value is flagged Investigate) and against any OEM absolute or custom project limits entered.

Disclaimer: Final acceptance is subject to manufacturer instructions, project specifications, applicable NETA/NEC requirements, and AHJ/qualified-person review.