Select the standard basis this inspection is recorded against. This record is a checklist/test log, not a certification of compliance.
Record each instrument used for electrical tests. Rows in the test tables reference these by description.
Enter measured values, project/manufacturer acceptance criteria, and results. Standard acceptance tables are not embedded — use project-approved criteria.